Enhancing COCOMO II Software Project Effort Estimation Model by Direct Integration of IFPUG Function Points Ahmed El Sayed Abdel-Gawad
Material type: TextLanguage: English Summary language: English Publication details: 2012Description: p. ill. 21 cmSubject(s): Genre/Form: DDC classification:- 627
Item type | Current library | Call number | Status | Date due | Barcode | |
---|---|---|---|---|---|---|
Thesis | Main library | 627/ A.A.E 2012 (Browse shelf(Opens below)) | Not For Loan |
Supervisor: Mahmoud Allam
Thesis (M.A.)—Nile University, Egypt, 2012 .
"Includes bibliographical references"
Contents:
Abstract:
Text in English, abstracts in English .
There are no comments on this title.