Amazon cover image
Image from Amazon.com
Image from Google Jackets

A Guide to task analysis / edited by B. Kirwan and L.K. Ainsworth.

Contributor(s): Material type: TextTextPublication details: London ; Washington, DC : Taylor & Francis, c1992.Description: xiii, 417 p. : ill. ; 25 cmISBN:
  • 0748400583 (paper)
Subject(s): DDC classification:
  • 004.21   22
Contents:
the task analysis process -- task analysis techniques -- Ask Data Collection -- Ask Description Methods -- Ask Simulation Methods -- Ask Behaviour Assessment Methods -- Ask Requirements -- Evaluation Methods -- Task Analysis Case Studies -- Balancing Automation And Human Action Through Task Analysis -- A Preliminary Communications System Assessment -- A Plant Local Panel Review -- A Staffing Assessment For A Local Control Room -- Ask Simulation To Predict Operator Workload In
Summary: This work shows readers how to target task analysis TA resources effectively over the life cycle of a project from conceptual design Through To Systems Operation, Noting The Role Of TA In Safety And Quality assurance, minimizing operator error.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Books Books Main library General Stacks 004.21 / KI.G 1992 (Browse shelf(Opens below)) 1 Available 000175

Includes bibliographical references and index.

the task analysis process -- task analysis techniques -- Ask Data Collection -- Ask Description Methods -- Ask Simulation Methods -- Ask Behaviour Assessment Methods -- Ask Requirements -- Evaluation Methods -- Task Analysis Case Studies -- Balancing Automation And Human Action Through Task Analysis -- A Preliminary Communications System Assessment -- A Plant Local Panel Review -- A Staffing Assessment For A Local Control Room -- Ask Simulation To Predict Operator Workload In

This work shows readers how to target task analysis TA resources effectively over the life cycle of a project from conceptual design Through To Systems Operation, Noting The Role Of TA In Safety And Quality assurance, minimizing operator error.

1

There are no comments on this title.

to post a comment.