A Production Scheduling Model for Plastic Injection Molding Process/ (Record no. 9779)

MARC details
000 -LEADER
fixed length control field 07897nam a22002537a 4500
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 201210b2022 a|||f bm|| 00| 0 eng d
040 ## - CATALOGING SOURCE
Original cataloging agency EG-CaNU
Transcribing agency EG-CaNU
041 0# - Language Code
Language code of text eng
Language code of abstract eng
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 658.4
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name George Ayad Farhat
245 1# - TITLE STATEMENT
Title A Production Scheduling Model for Plastic Injection Molding Process/
Statement of responsibility, etc. George Ayad Farhat
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Date of publication, distribution, etc. 2022
300 ## - PHYSICAL DESCRIPTION
Extent 66 p.
Other physical details ill.
Dimensions 21 cm.
500 ## - GENERAL NOTE
Materials specified Supervisor: Irene Samy
502 ## - Dissertation Note
Dissertation type Thesis (M.A.)—Nile University, Egypt, 2022 .
504 ## - Bibliography
Bibliography "Includes bibliographical references"
505 0# - Contents
Formatted contents note Contents:<br/>ACKNOWLEDGEMENT ..................................................................................................................... II<br/>ABSTRACT ...................................................................................................................................... IV<br/>NOMENCLATURE ........................................................................................................................... VII<br/>LIST OF TABLES ............................................................................................................................. VIII<br/>LIST OF FIGURES ............................................................................................................................. IX<br/>INTRODUCTION ............................................................................................................................... 1 1.1 Scheduling of Plastic Injection Molding .......................................................................... 3<br/>1.2 Universal for Metal and Supporting Industries ................................................................ 5<br/>1.3 The impact of scheduling on company performance ....................................................... 8<br/>LITERATURE REVIEW ..................................................................................................................... 10<br/>2.1 Classifications of machine scheduling problems ........................................................... 11<br/>2.2 Scheduling criteria and mathematical modeling ............................................................ 11<br/>2.3 Solution approaches for production scheduling optimization problems ........................ 13<br/>PROBLEM DESCRIPTION AND OBJECTIVES ................................................................................... 17<br/>3.1 Introduction .................................................................................................................... 17<br/>3.2 Problem Statement ......................................................................................................... 17<br/>3.3 Objective function of the optimization model................................................................ 18<br/>3.4 Constraints of the optimization problem ........................................................................ 19<br/>3.5 Formulation of the optimization problem ...................................................................... 21<br/>3.6 Assumptions and limitations .......................................................................................... 23<br/>3.7 Research objectives ........................................................................................................ 24<br/>VI<br/>METHODOLOGY ............................................................................................................................ 26<br/>4.1. Data collection................................................................................................................ 26<br/>4.2 Model development ........................................................................................................ 26<br/>4.3 Model verification .......................................................................................................... 29<br/>4.4 Metaheuristics ................................................................................................................ 30<br/>4.5 Problem division solution approach ............................................................................... 31<br/>4.6 Evaluation of solution approaches ................................................................................. 32<br/>SCHEDULING RESULTS AND ANALYSIS .......................................................................................... 33<br/>5.1 Numerical results............................................................................................................ 33<br/>5.2 A User-friendly schedule generator ............................................................................... 36<br/>5.3 A use case for scheduling framework in Universal for Metal and Supporting Industries 37<br/>4.5 Dynamic framework for decision making in manufacturing organizations. .................. 39<br/>CONCLUSION AND FUTURE WORK ............................................................................................... 41<br/>6.1. Research Limitations ......................................................................................................... 42<br/>6.2. Future Work ....................................................................................................................... 43<br/>REFERENCES ................................................................................................................................. 44<br/>Appendix ...................................................................................................................................... 47
520 3# - Abstract
Abstract Abstract:<br/>This thesis is an outcome of research collaboration between Nile University and Universal for Metal and Supporting Industries aiming at eliminating the gap between research and industry in Egypt. Being one of the most important manufacturers in the middle east, Universal for Metal and Supporting Industry always tries to increase its operations efficiency. This research focused on production scheduling, specifically in a large plastic injection molding facility. The author addressed a production scheduling problem faced by the company from a practical and a theoretical context. The problem is classified as a parallel machine scheduling and lot sizing problem. In order to identify the problem's nature and boundaries, numerous interviews, analyses, and literature surveys are conducted to produce a suitable mathematical optimization model for the problem. The scheduling optimization model is chosen from literature and various solution approaches are developed for the model. Many experiments are conducted to test the efficiency for each solution approach. After comparing these approaches, and because of the computational complexity of the problem, an improved solution approach based on mixed integer linear programming (MILP) is proposed. The approach proved its efficiency in both solution time and accuracy, compared to other solution approaches. Based on the previous work, a user-friendly scheduling tool is generated using MS-Excel and MATLAB to help production planners develop optimal schedules in a reasonable time with no need to write a code.<br/>From a managerial perspective, a dynamic decision-making framework is proposed to allow efficient data sharing through the organization which enhances the performance of all the organization departments, specifically, the production department. The outcomes of this research allow the company to measure and analyze the dynamics of its production operations and minimize the associated costs. They also allow for continuous improvement for all the organization departments through dynamic feedback and data sharing system. Last of all, this research work is a managerial approach to make the best use of technology and have it impact local industry.
546 ## - Language Note
Language Note Text in English, abstracts in English .
650 #4 - Subject
Subject MOT
655 #7 - Index Term-Genre/Form
Source of term NULIB
focus term Dissertation, Academic
690 ## - Subject
School MOT
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Thesis
650 #4 - Subject
-- 309
655 #7 - Index Term-Genre/Form
-- 187
690 ## - Subject
-- 309
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Date acquired Total Checkouts Full call number Date last seen Price effective from Koha item type
    Dewey Decimal Classification     Main library Main library 09/13/2022   658.4 /G.F.P/2022 09/13/2022 09/13/2022 Thesis